Land for Gas Peaking Energy Projects Required
Have you got spare land to rent (anywhere between ¼ and 1 acre)?
If so, we may be able to provide you with a long-term extra income stream!
The National Grid and why we need land
The National Grid is put under pressure at peak times of day when we all want to use electricity at the same time, yet at other times of the day there is surplus capacity. To help balance the ever-changing gap between demand and generation, peaking power plants supply electricity at short notice into the grid. Not only do the units provide additional power to the National Grid at peak times of day, they also assist in reducing power cuts which are generally caused by a sudden overload.
How Does it Work?
Peaking plants are generally gas engines that burn natural gas which in turn generate electricity which is supplied to the grid. The engines and generators are housed within specially built containers (similar to the containers used for shipping freight by sea).
Gas generation projects (also known as STOR projects) are now our focus, as battery energy storage in the UK has been hit with a major blow after the government lowered the de-rating factor in capacity market auctions. This means that investors are no longer willing to invest in UK battery storage projects due to the low returns and unstable government policies. However, the good news is that the market for gas generation projects is buoyant.
We are looking for suitable locations to install this technology.

Our requirements:
- Land between ¼ to 1 acre
- Located within 100m of a main power cable or an electrical substation
- Be a minimum of 100m from housing or other sensitive receptions, ie a school or hospital
- Within reach of a medium or intermediate pressure gas main
- We are looking for industrial land, which could even be a spare corner in a storage yard and land with a low agricultural grade that is not within greenbelt, AONB, SSSI or National Park. We will also consider industrial buildings.
The benefits to you:
- We will purchase the land or pay an annual rent in the region of £50k per acre (pro-rata) on a 25 year lease.
- Set-up and construction is completed within a short timescale with minimum disruption to you and any neighbouring land/properties.
Contact us
Telephone 07800 822118
Learn more about the work of AB Energy here